Find research datasets worth reusing
Search datasets from major research repositories and use ShareScore to quickly assess how well each record supports discovery, access, and reuse.
10,554
datasets available to search
ShareScore release 0.8.0
Dataset results
10,554 results for “measurements”
Year 2013, 15 minute measurements of stage in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA.
Year 2013, continuous measurements, every 15 minutes, were made of depth and stream temperature in a small headwater stream, Saw Mill Brook, Burlington, MA, draining a highly suburban catchment (72% residential). Discharge is determined from stage using discharge vs stage regressions.
Year 2014, 15 minute measurements of stage in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA.
Year 2014, continuous measurements, every 15 minutes, were made of depth and stream temperature in a small headwater stream, Saw Mill Brook, Burlington, MA, draining a highly suburban catchment (72% residential). Discharge is determined from stage using discharge vs stage regressions.
Year 2015, 15 minute measurements of stage in a small headwater stream draining a highly suburban catchment (72% residential), Saw Mill Brook, Burlington, MA.
Year 2015, continuous measurements, every 15 minutes, were made of depth and stream temperature in a small headwater stream, Saw Mill Brook, Burlington, MA, draining a highly suburban catchment (72% residential). Discharge is determined from stage using discharge vs stage regressions.
Hach, OTT RLS measurements of water column depth at 15 minute intervals in the lower Plum Island Sound off the Ipswich Bay Yacht Club pier, Ipswich, MA, year 2016
Measurements of water column depth at 15 minute intervals in Plum Island Sound at the Ipswich Bay Yacht Club, for year 2016. OTT radar level sensor (RLS) installed September 20, 2011 out of the water under the concrete pad on the Ipswich Bay Yacht Club pier, Ipswich, MA. RLS was mounted so that continuous year round measurements can be conducted without the concern of ice flows damaging the sensor.
Year 2016, 15 minute interval, water quality measurements of water column temperature, salinity, oxygen, and depth near the mouth of Plum Island Sound, Massachusetts
Year 2016, 15 minute measurements of water column temperature, salinity, oxygen and depth in Plum Island Sound at the Ipswich Bay Yacht Club, Ipswich, MA.
PIE LTER, Year 2017, 15 minute interval, water quality measurements of water column temperature, salinity, oxygen, and depth near the mouth of Plum Island Sound, Massachusetts
Year 2017, 15 minute measurements of water column temperature, salinity, oxygen and depth in Plum Island Sound at the Ipswich Bay Yacht Club, Ipswich, MA.
PIE LTER year 2014, 15 minute measurements of conductivity, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA.
Year 2014, continuous measurements every 15 minutes were made of conductivity, water temperature in Cart Creek, Newbury, MA, a small headwater stream draining a mainly forested catchment (55% forest + 19% wetland) in the Parker River watershed.
PIE LTER year 2015, 5 minute and 15 minute measurements of conductivity, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA.
Year 2015, continuous measurements every 15 minutes were made of conductivity, water temperature in Cart Creek, Newbury, MA, a small headwater stream draining a mainly forested catchment (55% forest + 19% wetland) in the Parker River watershed.
PIE LTER year 2013, 15 minute measurements of dissolved oxygen, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA.
Year 2013, continuous measurements every 15 minutes were made of dissolved oxygen, water temperature in Cart Creek, Newbury, MA, a small headwater stream draining a mainly forested catchment (55% forest + 19% wetland) in the Parker River watershed.
PIE LTER year 2014, 15 minute measurements of dissolved oxygen, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA.
Year 2014, continuous measurements every 15 minutes were made of dissolved oxygen, water temperature in Cart Creek, Newbury, MA, a small headwater stream draining a mainly forested catchment (55% forest + 19% wetland) in the Parker River watershed.
PIE LTER year 2015, 15 minute measurements of dissolved oxygen, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA.
Year 2015, continuous measurements every 15 minutes were made of dissolved oxygen, water temperature in Cart Creek, Newbury, MA, a small headwater stream draining a mainly forested catchment (55% forest + 19% wetland) in the Parker River watershed.
PIE LTER year 2012, 5 minute and 15 minute measurements of conductivity, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Br., draining Cedar Swamp, Reading, MA.
Year 2012, continuous measurements, every 5 minutes during the first deployment and then 15 minutes for the remainder of the year, were made of conductivity, water temperature in Bear Brook in Reading, MA, a small headwater stream draining Cedar Swamp, a mainly wetland catchment (49% wetlands and swamp + 36% forest) in the Ipswich River watershed.
PIE LTER year 2013, 15 minute measurements of conductivity, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Br., draining Cedar Swamp, Reading, MA.
Year 2013, continuous measurements, every 15 minutes were made of conductivity, water temperature in Bear Brook in Reading, MA, a small headwater stream draining Cedar Swamp, a mainly wetland catchment (49% wetlands and swamp + 36% forest) in the Ipswich River watershed.
PIE LTER year 2015, 15 minute measurements of conductivity, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Br., draining Cedar Swamp, Reading, MA.
Year 2015, continuous measurements, every 15 minutes were made of conductivity, water temperature in Bear Brook in Reading, MA, a small headwater stream draining Cedar Swamp, a mainly wetland catchment (49% wetlands and swamp + 36% forest) in the Ipswich River watershed.
PIE LTER year 2014, 15 minute measurements of conductivity, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Br., draining Cedar Swamp, Reading, MA.
Year 2014, continuous measurements, every 15 minutes were made of conductivity, water temperature in Bear Brook in Reading, MA, a small headwater stream draining Cedar Swamp, a mainly wetland catchment (49% wetlands and swamp + 36% forest) in the Ipswich River watershed.
PIE LTER Year 2012, 5 minute and 15 minute measurements of conductivity, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA.
Year 2012, continuous measurements, every 5 minutes for the first deployment and 15 minutes for the remainder of the year, were made of conductivity, water temperature in the Ipswich River behind the head of tide Sylvania Dam in Ipswich, MA.
PIE LTER Year 2013, 15 minute measurements of conductivity, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA.
Year 2013, continuous measurements, every 15 minutes were made of conductivity, water temperature in the Ipswich River behind the head of tide Sylvania Dam in Ipswich, MA.
PIE LTER Year 2014, 15 minute measurements of conductivity, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA.
Year 2014, continuous measurements, every 15 minutes were made of conductivity, water temperature in the Ipswich River behind the head of tide Sylvania Dam in Ipswich, MA.
PIE LTER Year 2015, 15 minute measurements of conductivity, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA.
Year 2015, continuous measurements, every 15 minutes were made of conductivity, water temperature in the Ipswich River behind the head of tide Sylvania Dam in Ipswich, MA.
PIE LTER Year 2015, 15 minute measurements of dissolved oxygen, water temperature at the Ipswich River head of tide, Sylvania Dam in Ipswich, MA.
Year 2015, continuous measurements, every 15 minutes were made of dissolved oxygen, water temperature in the Ipswich River behind the head of tide Sylvania Dam in Ipswich, MA.
ScienceDex guides
Understand access before you commit
These curated guides explain access requirements, typical timelines, costs, and reuse considerations for widely used research datasets.
Allen Brain Atlas
Allen Brain Atlas is an Allen Institute collection of brain map atlases, datasets, APIs, and analysis tools covering mouse, human, and non-human primate brain resources.
Annotated Behaviour and Observability Dataset (ABODe)
ABODe is a University of Edinburgh DataShare dataset for behavior classification in group-housed mice using home-cage video, identities, bounding boxes, ground-plate positions, and annotator labels.
DANDI Archive for NWB datasets
DANDI is a BRAIN Initiative archive for publishing and sharing neurophysiology data, including electrophysiology, optophysiology, and behavioral data packaged as NWB and related standards.
International Brain Laboratory public data
The International Brain Laboratory public data releases expose standardized mouse decision-making experiments, including Neuropixels recordings, widefield calcium imaging, behavior, and session metadata accessed through the ONE API.
OpenNeuro
OpenNeuro is a free, open platform for sharing neuroimaging datasets, with public search, dataset pages, and download paths for web, S3, DataLad, and the OpenNeuro CLI.