Skip to main content
ConductScienceScienceDex
zenodoopen

EFFECT OF PROJECT PLANNING ON THE PERFORMANCE OF A ROAD CONSTRUCTION PROJECT: A CASE OF KICUKIRO CENTER-KAGARAMA-MUYANGE ROAD IMPLEMENTED BY NPD LTD IN KICUKIRO DISTRICT, RWANDA

<p><strong>ABSTRACT:</strong> The study investigated the project planning and performance of road construction project specifically the Kicukiro Center-Kagarama-Muyange Road in Rwanda. The study was guided by specific objectives which are&nbsp;to ascertain the effects of scope planning on performance of road construction projects; to determine the effect of resource planning on performance of road construction projects; to determine the effect of Risk planning on performance of road construction projects; and to examine the effect of stakeholders planning on performance of road construction projects.&nbsp; Descriptive and correlative research designs; and the mixed approach of qualitative and quantitative approaches were used. Targeted population was 237 persons. The study had 149 respondents as sample size.&nbsp;Data collection methods were documentary analysis; questionnaire; interview guide; and&nbsp;observations. Descriptive statistic method was used to analyze collected data specifically the frequencies, percentages, mean, and standard deviation. Correlation coefficient; and&nbsp;multiple linear Regression analysis models were adopted.&nbsp;The results showed that there is a positive and strong correlation between Project scope planning and Performance. The findings showed level of f-test model is 228.710 which is positive with p-value of 0.000b less than both standard significance levels of 0.05 and 0.01. The study retained alternative hypothesis stated that Ha1 stated that&nbsp;there is a significant effect of resource planning on performance of road construction project; Ha2 said that&nbsp;there are significant effects of scope planning on performance of road construction project; Ha3&nbsp;stated that there are significant effects of Risk planning on performance of road construction project; and Ha4 said that there are significant effects of stakeholder's involvement on performance of construction projects of Kicukiro Center-Kagarama-Muyange. Kicukiro District.&nbsp;</p><p>&nbsp;</p><p><strong>Key words:&nbsp;</strong>project planning; performance; road construction project</p><p>&nbsp;</p>

ShareScore

32/100

Overall dataset sharing score

Score breakdown

These five areas show where the dataset supports — or may limit — practical reuse.

Stewardship
4
Harmonization
4
Access
16
Reuse readiness
8
Engagement
0

Dataset details

Repository
zenodo
Published
October 26, 2023
License
cc-by-4.0
DOI
10.5281/zenodo.10047915

Scored with release 0.9.0

ScienceDex for faculty

Your academic CV and NIH biosketch

Make your CV in your school's format and your NIH biosketch from it, then download both as Word files.