Skip to main content
ConductScienceScienceDex
zenodoopen

Part of the electricity transmission system from Croatia (10 nodes)

<p>This dataset was prepared under the framework of the ATTEST project, financed by the European Commission with grant number 864298. The dataset contains information about part of the real Transmission grid, totally anonymized, located in Croatia as in 2020. Two types of network files (including grid topology, nodes, generators, consumption, all of which connected by power lines or transformers) are provided. The network files (MatPower and PSS/E formats) includes a &ldquo;snapshot&rdquo; or &ldquo;steady-state&rdquo; at a given time with a converged power flow solution. The grid, which is operated at 400 kV, 220 kV, and 110, has 10 nodes, 22 branches and 4 generators.</p>

ShareScore

28/100

Overall dataset sharing score

Score breakdown

These five areas show where the dataset supports — or may limit — practical reuse.

Stewardship
4
Harmonization
4
Access
16
Reuse readiness
0
Engagement
4

Dataset details

Repository
zenodo
Published
December 31, 2021
License
cc-by-4.0
DOI
10.25747/0v8r-z261

Scored with release 0.9.0

ScienceDex for faculty

Your academic CV and NIH biosketch

Make your CV in your school's format and your NIH biosketch from it, then download both as Word files.