Skip to main content
zenodoopen

CROSSBOW TC_01.01.01 final demonstration results

<p>This data set represents&nbsp;final demonstration results for the Test Case 1.1 from the High Level Use case 1 of the CROSSBOW project. It contains information about values: ERIC [MW], TIC&nbsp; [MW], TIF [MW], Loop flow [%], Optimal adequacy transaction [MW] and Net adequacy exchange [MW] for 9 areas (AL, BA, BG, GR, ME; MK, HR, RO and RS)&nbsp;and 366 timestamps (of Week 9 and Week 10 of 2021).&nbsp;</p> <p>All information about RAA methodology and terms used in this data set could be found in document <em>D4.2 CROSSBOW Regional Operation Centre Balancing Cockpit (ROC-BC).</em></p>

ShareScore

40/100

Overall dataset sharing score

Score breakdown

These five areas show where the dataset supports — or may limit — practical reuse.

Stewardship
8
Harmonization
4
Access
16
Reuse readiness
8
Engagement
4

Topics