zenodoopen
CROSSBOW TC_01.01.01 final demonstration results
<p>This data set represents final demonstration results for the Test Case 1.1 from the High Level Use case 1 of the CROSSBOW project. It contains information about values: ERIC [MW], TIC [MW], TIF [MW], Loop flow [%], Optimal adequacy transaction [MW] and Net adequacy exchange [MW] for 9 areas (AL, BA, BG, GR, ME; MK, HR, RO and RS) and 366 timestamps (of Week 9 and Week 10 of 2021). </p> <p>All information about RAA methodology and terms used in this data set could be found in document <em>D4.2 CROSSBOW Regional Operation Centre Balancing Cockpit (ROC-BC).</em></p>
ShareScore
40/100
Overall dataset sharing score
Score breakdown
These five areas show where the dataset supports — or may limit — practical reuse.
- Stewardship
- 8
- Harmonization
- 4
- Access
- 16
- Reuse readiness
- 8
- Engagement
- 4