Skip to main content
zenodoopen

Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset

<p>Input and output data of the modelling work for the paper Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System</p> <ul> <li>Considered scenario years: 2030, 2040 and 2050</li> <li>The profiles are based on the historical year 2016.</li> <li>Two scenarios are included: lower connectivity and high connectivity</li> <li>The data cover the ENTSO-E member countries except Iceland and Cyprus and is given in country-specific resolution.</li> </ul> <p><strong>Input:</strong></p> <ul> <li>Demand as hourly profile in MWh</li> <li>Variable RES-E as hourly profile in MWh</li> <li>Power plant fleet as capacities in MW</li> <li>NTCs as capacities in MW</li> </ul> <p><strong>Output:</strong></p> <ul> <li>CO2 emissions as annual data in Mt</li> <li>Variable electricity generation costs&nbsp;as annual data in MEur</li> <li>Variable electricity generation costs per generation as annual data in Euro/MWh</li> <li>Electricity generation as annual data in TWh</li> <li>Electricity export as annual data in TWh</li> <li>Electricity import as annual data in TWh</li> <li>Transit flows as annual data in TWh</li> </ul> <p>The sources are described in the corresponding paper under the following link: <a href="https://www.mdpi.com/1996-1073/12/16/3098">https://www.mdpi.com/1996-1073/12/16/3098</a></p>

ShareScore

44/100

Overall dataset sharing score

Score breakdown

These five areas show where the dataset supports — or may limit — practical reuse.

Stewardship
4
Harmonization
8
Access
20
Reuse readiness
8
Engagement
4

ScienceDex for faculty

Your academic CV and NIH biosketch

Make your CV in your school's format and your NIH biosketch from it, then download both as Word files.