zenodoopen
Data on planned eHV transmission lines in Germany
<p>Contains manually created lists of planned eHV AC and DC lines in Germany based on the Grid development plan 2021. The main source was the Grid development plan 2021, second draft by the German transmission system operators.</p> <p>In addition, a shapefile including lines that will be replaced by these lines is included.</p> <p>The data was created for the data processing tool <a href="https://github.com/openego/eGon-data">eGon-data </a>within the research project hybit. </p> <p>We thank the Federal Ministry of Education and Research (BMBF) for funding the project hybit (FKZ: 03SF0687A).</p>
ShareScore
36/100
Overall dataset sharing score
Score breakdown
These five areas show where the dataset supports — or may limit — practical reuse.
- Stewardship
- 4
- Harmonization
- 4
- Access
- 16
- Reuse readiness
- 8
- Engagement
- 4