Skip to main content
zenodoopen

Seismic Inverted Impact force and Digital Elevation Models before and after the 2018 Baige Landslide

<p>For the data of inverted seismic force, the seismic signals recorded by the broadband seismic stations were prepared for the inversion of the force-time function by the following series of actions:</p> <ul> <li>Removing the instrumental response</li> <li>Resampling to 0.5 s</li> <li>Integrating the signals from velocity to displacement</li> <li>Rotating the horizontal components to the radial and transverse direction</li> <li>Filtering the signals between periods of 30 and 140 s</li> </ul> <p>For the digital elevation models (DEMs) of the Baige landslide, the pre-failure DEM with 10 m grid spacing was obtained from the Sichuan Bureau of Surveying Mapping and Geoinformation (SBSMG). At the same time, the post-failure DEM was derived from the UAV-based photogrammetry.</p>

ShareScore

36/100

Overall dataset sharing score

Score breakdown

These five areas show where the dataset supports — or may limit — practical reuse.

Stewardship
8
Harmonization
4
Access
12
Reuse readiness
8
Engagement
4

Topics