H2020 Platone German Demonstrator - Use Case Setting Data

<p>This dataset belongs to the German demonstrator of the H2020 Platone project (WP5). The dataset&nbsp;contain&nbsp;information that have been set for Use Cases (UCs) parameterization during the project phase. UC&nbsp;have been parameterized along a grafical user interface (GUI) named &quot;Use Case Selector&quot;. Each parameterized UC&nbsp;triggered has been logged in the dataset.</p> <p><strong>Background - Field Test Setup</strong></p> <p>The field test setup consists of a Low Voltage (LV) community with 450 kW installed generation capacity. The power exchange between the LV grid and Medium Voltage (MV) grid&nbsp;takes place along a&nbsp;single&nbsp;point of common coupling (PCC). i.e., a secondary substation that includes a transformer with senors on the LV busbar, to measure&nbsp;the net power exchange. The community consists of 89 households, 450kW of installed PV generation capacity, a Community Battery Energy Storage (CBES) connected to the LV busbar with 300 kW and 850 kWh capacity.&nbsp;</p> <p><strong>Definition of data:</strong></p> <p><strong>RequID</strong> - Request ID - Identifier&nbsp;for each triggered UC</p> <p><strong>Alert</strong> - Indicates, whether UC has been executed successfull (&nbsp;&quot; &quot;and &quot; true&quot; indacates successfull implementation by Energy Management System (EMS); &quot;false&quot; indicates that UC has not been implemented by EMS)</p> <p><strong>Submission -</strong> timestamp of UC submission<strong>&nbsp;</strong></p> <p><strong>Note -</strong>&nbsp;Annotations entered by UseCase operator</p> <p><strong>Priority -</strong>&nbsp;Defines UC priority set by operator (priority: 1 - high , 2 - medium, 3 - low, 4 - very low) (only relevant for UC 2)</p> <p><strong>Status - </strong>Indicates the status of the UC (closed - UC has been executed, cancelled, UC has been has been canceled before or during application)</p> <p><strong>Start</strong> - Point of time set for the beginning of UC</p> <p><strong>End</strong> - Point of time set for the end of UC</p> <p><strong>Type</strong>- Triggered Type of UC (1 - &quot;Virtual Islanding of LV community&quot; (UC 1);&nbsp;2&nbsp;- &quot;Coordination of Flex Request&quot; (UC 2); 3 - &quot;Energy Import in Bulk&quot; (UC 3); 4 - &quot;Bulk-based Energy Export&quot; (UC 4)</p> <p><strong>Subtype</strong> - 0 - Rule-Based&nbsp;Operation Mode with 15-minutes control cycles of battery (CBES in the field) ;1 - Day-ahead forecast-based control; 2.0 - Schedule-based operation mode with optimization applied to a day-ahead forecast (optimization target: minimization of power exchanges at MV/LV PCC within 24h period&nbsp;; 21 - Schedule-based operation mode with optimization applied to a day-ahead forecast (optimization target: minimization of power exchanges at&nbsp;MV/LV PCC and achieving a requested State of Charge (of CBES) at the end of UC_End;</p> <p><strong>bulkStart</strong> - Point of time of start of energy bulk import or export (only relevant for UC 3 and 4)</p> <p><strong>bulkEnd</strong> -&nbsp;Point of time of end of energy bulk import or export&nbsp;(only relevant for UC 3 and 4)</p> <p><strong>bulk Energy</strong> -&nbsp;Amount of energy triggered to be imported or exported as bulk&nbsp;(only relevant for UC 3 and 4)</p> <p><strong>Final_SOF </strong>- State of Charge (SOC) of CBES that should&nbsp;be achieved at end of UC (End)</p> <p><strong>FlexDemand&nbsp;</strong>- Requested power exchange that should be achieved at MV/LV PCC (Only relevant for UC 2)</p> <p><strong>Ptcb - </strong>Measured CBES charging power at poin of time of UC submission&nbsp;</p> <p><strong>Ptei </strong>-&nbsp;Measured power exchange at PCC at point of time of UC submission&nbsp;</p> <p><strong>SoC </strong>-&nbsp;State of Charge of CBES at point of time of UC submission&nbsp;</p> <p><strong>SoE</strong> -&nbsp;State of Energyof CBES at point&nbsp;of time of UC submission&nbsp;</p> <p><strong>ActiveSet&nbsp;</strong>-&nbsp;State of Energyof CBES at point of time of UC submission&nbsp;</p> <p><strong>maxSoC </strong>- Maximum SoC set for CBES&nbsp;at point of time of UC submission&nbsp;</p> <p><strong>minSoc -&nbsp;</strong>MinimumSoC set for CBES&nbsp;at point of time of UC submission&nbsp;</p> <p>This project has received funding from the European Union&rsquo;s Horizon 2020 research and innovation programme under grant agreement No 864300.</p>

ShareScore

44/100

Overall dataset sharing score

Score breakdown

These five areas show where the dataset supports — or may limit — practical reuse.

Stewardship
4
Harmonization
4
Access
20
Reuse readiness
8
Engagement
8

ScienceDex for faculty

Your academic CV and NIH biosketch

Make your CV in your school's format and your NIH biosketch from it, then download both as Word files.