Find research datasets worth reusing
Search datasets from major research repositories and use ShareScore to quickly assess how well each record supports discovery, access, and reuse.
1,515
datasets available to search
ShareScore release 0.7.1
Dataset results
1,515 results for “marshes”
Aboveground biomass data from a Spartina alterniflora-dominated salt marsh plots in North Inlet, Georgetown, SC.
Aboveground biomass is determined non-destructively at permanent plots in a Spartina alterniflora-dominated salt marsh in North Inlet, Georgetown, SC. There are five sites. Two sites are low marsh; three sites are high marsh. One site in the high marsh is fertilized with nitrogen and phosphorus.
Annual productivity at Spartina alterniflora-dominated salt marsh plots in North Inlet, Georgetown, SC.
Annual productivity is determined from aboveground biomass data in a Spartina alterniflora-dominated salt marsh plots in North Inlet, Georgetown, SC. Aboveground biomass is determined non-destructively. There are five sites. Two sites are low marsh; three sites are high marsh. One site in the high marsh is fertilized with nitrogen and phosphorus.
Marsh surface elevation data in fertilization plots of a Spartina alterniflora-dominated salt marsh at Goat Island, North Inlet, Georgetown, SC.
A Surface Elevation Table (SET) is used to measure changes in the elevation of the marsh platform in fertilization plots of a Spartina alterniflora-dominated marsh on the Goat Island, North Inlet, Georgetown, SC.
Nutrient concentrations from porewater samples at Spartina alterniflora-dominated salt marsh plots in North Inlet, Georgetown, SC.
Nutrient concentrations from permanent porewater samplers in a Spartina alterniflora-dominated salt marsh in North Inlet, Georgetown, SC. There are six sites. Two sites are low marsh; four are high marsh. One site in the high marsh is fertilized with nitrogen and phosphorus. One site in the high marsh is located in a dieback. Sampling at the dieback site occurred from 2006-2010.
Marsh water table height, logging data from the Railroad site on the Parker River for July-November 2004.
Measurements of water table height in the Parker River marsh located downstream of the railroad bridge. Measurements were taken every 10 minutes at each logger along a transect of water level loggers running perpendicular to the Parker River bank at the railroad site, MAR-PR-Wtable-RR, for July-November 2004.
Marsh water table height, logging data from the Railroad site on the Parker River for April-December 2006.
Measurements of water table height in the Parker River marsh located downstream of the railroad bridge. Measurements were taken every 10 minutes at each logger along a transect of water level loggers running perpendicular to the Parker River bank at the railroad site, MAR-PR-Wtable-RR, for April - December 2006.
Marsh water table height, logging data from the Typha site on the upper Parker River for June-November 2004
Measurements of water table height in the upper Parker River Typha sp. marsh. Measurements were taken every 10 minutes at each logger along a transect of water level loggers running perpendicular to the Parker River bank at the Typha site, MAR-PR-Wtable-T, for June - November 2004.
Marsh water table height, logging data from the Typha site on the upper Parker River for April-December 2006.
Measurements of water table height in the upper Parker River Typha sp. marsh. Measurements were taken every 10 minutes at each logger along a transect of water level loggers running perpendicular to the Parker River bank at the Typha site, MAR-PR-Wtable-T, for April - December 2006.
Marsh water table height, logging data from the Typha marsh site on the upper Parker River for April-November 2007.
Measurements of water table height in the upper Parker River Typha sp. marsh. Measurements were taken every 5 minutes at each logger along a transect of water level loggers running perpendicular to the Parker River bank at the Typha site, MAR-PR-Wtable-T, for April - November 2007.
Marsh water table height, logging data from the railroad Spartina marsh site on the Parker River for April-December 2007.
Measurements of water table height in the Parker River marsh located downstream of the railroad bridge. Measurements were taken every 10 minutes at each logger along a transect of water level loggers running perpendicular to the Parker River bank at the railroad site, MAR-PR-Wtable-RR, for April - December 2007.
PIE LTER measurements of the two tallest Phragmites australis stems per five meter interval along transects at the Argilla Rd. salt marsh restoration site (Ipswich, MA) and Rough Meadows reference marsh (Rowley, MA – Stackyard Road area).
The file contains measurements of the two tallest Phragmites australis stems per five meter interval along transects at the Argilla Rd. salt marsh restoration site (Ipswich, MA) and Rough Meadows reference marsh (Rowley, MA – Stackyard Road area). The culvert feeding Argilla Marsh was enlarged in late November 1998, thus data from 1999 onward is considered as representing a hydrologically restored marsh. A long term study not directly part of the PIE LTER, but a companion study related to tidal restrictions and hydrological alterations of salt marshes in the Plum Island ecosystem.
PIE LTER plant species percent cover in quadrats along vegetation transects at the Argilla Rd. salt marsh restoration site (Ipswich) and Rough Meadows reference marsh (Rowley – Stackyard Road area), Massachusetts.
Plant species percent cover in quadrats along vegetation transects at the Argilla Rd. salt marsh restoration site (Ipswich) and Rough Meadows reference marsh (Rowley – Stackyard Road area), Massachusetts. A long term study not directly part of the PIE LTER, but a companion study related to tidal restrictions and hydrological alterations of salt marshes in the Plum Island ecosystem.
PIE LTER geographic information regarding vegetation transects set up at the Argilla Rd. Salt marsh restoration site in Ipswich and a reference marsh (Rough Meadows) in Rowley, Massachusetts.
A description of the vegetation transects set up at the Argilla Rd. Salt marsh restoration site in Ipswich, MA and a reference marsh (Rough Meadows) in Rowley, MA.
Macroinfaunal counts, 2003-2020, from marsh cores along Rowley River tidal creeks associated with long term fertilization experiments, Rowley, MA.
Macroinfaunal counts, 2003-2006, 2007, 2009, 2012--2020 from marsh cores along Rowley River tidal creeks associated with long term fertilization experiments, Rowley, MA. The long term fertilization experiment, TIDE project, aims to simulate eutrophication on a large scale by the addition of NO3- aiming to reach 70μM concentrations from May to September every year during the growing season. This fertilization of the marsh has been going on at Sweeney Creek since the 2004 growing season and at Clubhead Creek in 2005 and then from 2009 till 2016. Fertilization stopped in 2016.
Marsh water table height, logging data from the Typha marsh site on the upper Parker River for April-October 2008.
Measurements of water table height in the upper Parker River Typha sp. marsh. Measurements were taken every 5 minutes at each logger along a transect of water level loggers running perpendicular to the Parker River bank at the Typha site, MAR-PR-Wtable-T, for April - October 2008.
Marsh water table height, logging data from the Typha marsh site on the upper Parker River for September-November 2011.
Measurements of water table height in the upper Parker River Typha sp. marsh. Measurements were taken every 5 minutes at each logger along a transect of water level loggers running perpendicular to the Parker River bank at the Typha site, MAR-PR-Wtable-T, for September - November 2011.
Marsh plant species percent cover for Rowley River tidal creeks associated with long term fertilization experiments, Rowley and Ipswich, MA.
Marsh plant species percent cover for Rowley River tidal creeks associated with long term fertilization experiments, Rowley and Ipswich, MA. The TIDE project aims to simulate eutrophication on a large scale by the addition of NO3- aiming to reach 70µM concentrations from May to September every year during the growing season. This fertilization of the marsh has been going on at Sweeney Creek since the 2004 growing season through 2011 and at Clubhead Creek in 2005 and from 2009 till 2011.
PIE LTER plant species presence along vegetation transects at the Argilla Rd. salt marsh restoration site (Ipswich) and Rough Meadows reference marsh (Rowley – Stackyard Road area), Massachusetts.
Plant species presence along vegetation transects at the Argilla Rd. salt marsh restoration site (Ipswich) and Rough Meadows reference marsh (Rowley – Stackyard Road area). A long term study not directly part of the PIE LTER, but a companion study related to tidal restrictions and hydrological alterations of salt marshes in the Plum Island ecosystem..
Marsh plant species C:H:N data for Rowley River tidal creeks associated with long term fertilization experiments, Rowley and Ipswich, MA.
Marsh plant species C:H:N data for Rowley River tidal creeks associated with long term fertilization experiments, Rowley and Ipswich, MA. The TIDE project aims to simulate eutrophication on a large scale by the addition of NO3- aiming to reach 70µM concentrations from May to September every year during the growing season. This fertilization of the marsh has been going on at Sweeney Creek since the 2004 growing season through 2011 and at Clubhead Creek in 2005 and from 2009 till 2011.
Marsh plant species frequency of occurrence along marsh transects for Rowley River tidal creeks associated with long term fertilization experiments, Rowley and Ipswich, MA.
Marsh plant species frequency of occurrence along marsh transects for Rowley River tidal creeks associated with long term fertilization experiments, Rowley and Ipswich, MA. The TIDE project aims to simulate eutrophication on a large scale by the addition of NO3- aiming to reach 70µM concentrations from May to September every year during the growing season. This fertilization of the marsh has been going on at Sweeney Creek since the 2004 growing season through 2011 and at Clubhead Creek in 2005 and from 2009 till 2011.
ScienceDex guides
Understand access before you commit
These curated guides explain access requirements, typical timelines, costs, and reuse considerations for widely used research datasets.
Allen Brain Atlas
Allen Brain Atlas is an Allen Institute collection of brain map atlases, datasets, APIs, and analysis tools covering mouse, human, and non-human primate brain resources.
Annotated Behaviour and Observability Dataset (ABODe)
ABODe is a University of Edinburgh DataShare dataset for behavior classification in group-housed mice using home-cage video, identities, bounding boxes, ground-plate positions, and annotator labels.
DANDI Archive for NWB datasets
DANDI is a BRAIN Initiative archive for publishing and sharing neurophysiology data, including electrophysiology, optophysiology, and behavioral data packaged as NWB and related standards.
International Brain Laboratory public data
The International Brain Laboratory public data releases expose standardized mouse decision-making experiments, including Neuropixels recordings, widefield calcium imaging, behavior, and session metadata accessed through the ONE API.
OpenNeuro
OpenNeuro is a free, open platform for sharing neuroimaging datasets, with public search, dataset pages, and download paths for web, S3, DataLad, and the OpenNeuro CLI.